The Launch Authorisation Board (LAB) for PSLV-C16/RESOURCESAT-2 mission, which met on April 16, 2011 at Satish Dhawan Space Centre - SHAR, Sriharikota has cleared the launch of PSLV-C16 at 10:12 hrs (IST) on Wednesday, April 20, 2011. LAB reviewed the readiness of the launch vehicle, spacecraft systems and ground stations and has authorised the commencement of the 54 hour Count Down during the early hours of April 18, 2011.
During the Count Down, propellant-filling operations of the liquid propellant second stage (PS2) and fourth stage (PS4) of the launch vehicle will be carried out. Mandatory checks on the launch vehicle and spacecraft - including charging of batteries and pressurisation of propellant tanks will be performed. Readiness of launch infrastructure such as tracking radar systems and communication networks will also be checked.
PSLV-C16 will launch RESOURCESAT-2, YOUTHSAT and X-SAT satellites. RESOURCESAT-2 built by ISRO - the primary satellite is an advanced remote sensing satellite weighing 1206 kg for facilitating the study and management of natural resources. YOUTHSAT weighing 92 kg is a joint Indo-Russian satellite for stellar and atmospheric studies. X-SAT weighing 106 kg is a microsatellite for imaging applications built by Nanyang Technological University (NTU), Singapore.
Keine Kommentare:
Kommentar veröffentlichen